Your passage to launch
Five waypoints from reserved to underway
Reserved
Jun 2026
The wait
You are here
Design window
Opens ~Sep 15
Build
Nov 2026
Launch
Splash & support
What is happening now
Your slot is locked and nothing is required from you yet. We check in each quarter, and your design window opens about eight weeks before your build.
Building your own hull while you wait? You have a head start you can spend any time: one video call and a few emailed questions, for the decisions that keep your hull work moving.
Your hull-build head start
Yours to use before the design window opens.
Video callOne hour, book any time
Available
Emailed questions3 of 4 remaining
Payment milestones
- Slot depositPaid 12 Jun 2026 · credited in full to your build$3,500 PAID
- Design feeOpens your design window · credited to your build$2,000
- Build startBefore we order parts for your boatSet at design
- CompletionBefore launch and commissioningSet at design
Your two deposits are not extra. Both are credited in full toward your build total, which is set during your design window once your system is specified for Halcyon.
Vessel profile
Vessel
Halcyon
Make & model
Cape George 36
Year
1988
Current engine
Volvo MD17C, diesel
Displacement
24,000 lb
Drive type
Shaft, geared
Your system is designed together in your design window
Opening around 15 September 2026. Over two calls we select your propulsion, energy, and house systems for Halcyon, then finalize your specification and quote. It appears here once designed.
Before your window
Photos and video on file
Everything we asked for at reserve is in. Nothing further needed until your window opens.
Engine bay & drive photos
9 of 9 shots received
Vessel walkthrough video
6 min · received 14 Jun
Your documents
What to expect
Your build, start to finish · PDF
Boat profile
Submitted 10 Jun 2026 · PDF
Reservation agreement
Signed 12 Jun 2026 · PDF
Design specification
Prepared during your design window
Install & MarineDash manuals
Handed over at commissioning
Messages
Powerflow
Welcome aboard, Tom. Halcyon is slotted for November. If a hull-build decision comes up before your design window, send it here or book your call. Otherwise, enjoy the quiet. We will check in each quarter.Mon 16 Jun
You
Thanks. One question while I am glassing the engine beds: roughly how much fore-and-aft length should I leave for the motor and coupling so I do not box myself in?Sat 21 Jun
Powerflow
Good one to settle now. Leave 22 inches clear from the shaft-log face and you will have room for either single or dual on a 36. That used one of your four questions. Three left, plus your call.Mon 23 Jun
3 of 4 questions left · 1 call available
Payment milestones
- Slot depositPaid 12 Jun 2026 · credited in full to your build$3,500 PAID
- Design feeOpens your design window · credited to your build$2,000
- Build startBrings you to 60% of your build total · before we order partsSet at design
- CompletionFinal 40% · before launch and commissioningSet at design
Your build total is set during your design window, once Halcyon's system is specified. Your slot deposit and design fee are credited toward it in full, so together they count against your 60% at build start.